Heat Meter On Shed Three


The heat meter went live on shed 3 on the 3rd March at Savage Cat Farm. The reading yesterday morning was 38 megawatts, which will be paid at the tier 1 RHI rate of £79 per megawatt, which equals just over £3,000 of subsidy accrued in just over two weeks. I will sit down and write out a full analysis and post it here, soon, giving the fuel consumption and associated costs compared with the other three sheds, which are still running on Priva heaters powered by oil. We already know we have halved the fuel cost.