We are on our third day of turnaround, fitting three 75KW Climatec XHeat heaters to each 300′ x 80′ house on the site. They look a bit weird, like they are hovering there, don’t they?
All the house pipework is stainless steel with a twenty year warranty. One of our guys, Jerry, is still on site powerfloating the boilerhouse concrete slabs — he is hoping to be finished by ten tonight. We haven’t left before 7pm each evening so far. Trevor and Dak will be there tomorrow morning at six to get ahead of us with drop rods and clips for a couple of hours
We should get our fourth house wrapped up tomorrow. Then next week is pod production, and the week after we have six more poultry houses to do at Martock, as well as shoehorning a 70KW pellet boiler into a country house near Sutton Montis. They are desperate for the new boiler, as their oil boiler is getting through about £1200 a month in kerosene. Changing over to pellets should just about half that, as well as attracting a decent RHI payment.