Case Study – EC Drummond


This is the view inside one of our new ETA Hack 200 biomass boiler containers. This is one of three destined for The Homme — EC Drummond’s home farm at Ross On Wye. The containers are built at our new factory unit at Shepton Mallet. We assemble the containers, fit […]

ETA Biomass Containers Craned Onto Site


Pipework to Big Dutchman 40H heaters at EC Drummond, Homme Farm
We are fitting three 200Kw ETA Biomass Boilers at EC Drummond’s poultry houses in Ross On Wye. The Big Dutchman 40H heaters were put in place and piped-up over the Easter bank holiday weekend. Poultry factory delays pushed our scheduled dates out and presented us with a few challenges, but […]

Biomass boilers for Homme Farm poultry houses