This is the view inside one of our new ETA Hack 200 biomass boiler containers. This is one of three destined for The Homme — EC Drummond’s home farm at Ross On Wye. The containers are built at our new factory unit at Shepton Mallet. We assemble the containers, fit the biomass boiler, buffer, pumps, etc. It’s all wired-up and tested before being loaded onto low loaders and transported to site.
The lorries arrived on site at around four PM — a little later than planned.
No need for a crane — the hi-ab is powerful enough to pick up the container and ease it into position millimetre perfect.
Here is one of the finished ones with the chip store attached.