This biomass installation at a Cotswold broiler farm is fed by two powerhouses constructed in our workshop in Somerset and transported to site in sections. They were erected on a reinforced concrete base.
The nature of a broiler farm meant Commercial Biomass Partnership had just three days between washing down and re-bedding, to complete the installation.
The Big Dutchman Heatmaster convectors were suspended from the roof along the ridge line of the house, three in each of the 25,000 bird sheds. They are mounted one metre from the floor and throw out heat in six directions. Working range per side is 13 metres. Clients are often impressed by the small size of the heaters, and by how quiet they are in operation.