Here we are moving another commercial biomass boiler into place on a UK broiler farm in the Cotswolds.
These Eta Hack 200 biomass boilers weigh in excess of two tonnes, so it’s a tad more than a man on each corner can cope with.
Three walls of the prefabricated boilerhouse were erected and propped to give the structure stability.
The buffer vessel and boilerhouse pod were put in place, followed by the boiler.
These days life is much easier and the job much quicker with us having a purpose-built biomass container, which you can see here